Level of radiation safety of Ukrainian NPP in 2005

Operation of nuclear power plants in Ukraine is made according to Laws “About using nuclear power and radiation safety”, “About human protection from ionization radiation”, Norms of radiation safety of Ukraine (NRSU-97) and others. The main aim of acting legislation is to determine basis requirements to health care from possible harm that connected with radiation, requirement to safety operation of NPP and also to environment protection.

According to that acting nuclear power plant satisfies safety demands when its radiation influence does not exceed stated norm of radiation exposure of the personnel of the NPP and population and also gas and aerosol emissions and liquid wastes on content of radioactive substances in environment.

Normalization of NPP’s influence on the environment is made by the levels of exposures and spews of radioactive instances in environment.

Their inflows in environment are shown in percentage ratio according to permissible levels that are worked at the every NPP and negotiated with Ministry of health of Ukraine.
I

n common, radiation parameters that characterized work of NPP in 2004 and 2005 did not exceed normative rate and radiation safety of the personnel and population was at the adequate level. For the last years operation of NPP did not make any ecological changes.  


LATEST NEWS

07.05.2012 Information Note on the Bolgrad Ñombined Cycle Power Plant Investment Project
17.01.2012 Welcome investors to cooperation
10.12.2011 Ecological assessment report. Main report. (30 september 2011 version 4)
27.09.2011 QUESTIONS-ANSWERS BOOK Ukraine NPPs Safety Upgrade Program Ecological Assessment (21 September 2011 version 4)
01.07.2011 Draft ecological assessment report. Main report
22.06.2011 Draft ecological assessment report summary for the public
22.06.2011 Stakeholder engagement plan
22.06.2011 Scoping study report
13.10.2010 International conference “Ukrainian Nuclear Forum” Association
10.03.2010 The State Enterprise National Nuclear Energy Generating Company “Energoatom” is going to procure nuclear materials (Natural Uranium Hexafluoride and Enriched Uranium Hexafluoride) in the amount necessary for reloading two VVER-1000 units in 2011 and for annual reload of three VVER-1000 power units for the period 2012-2015
23.01.2007 TVEL and Energoatom signed the contract for nuclear fuel supply
14.11.2006 On November 13, Nuclear Power Plants have produced 266.39 million KWh of electricity
13.11.2006 On November 12, Nuclear Power Plants have produced 263.84 million KWh of electricity
10.11.2006 NNEGC “Energoatom” extended Tender Bid submission period in Tender for Procurement of Uranium Products untill November, 24
10.11.2006 On November 9, Nuclear Power Plants have produced 242.23 million KWh of electricity